Construction Heads Up Part 13: March Break Routes

7 Mar
Hydro chamber construction on Queens Quay West

Hydro chamber construction on Queens Quay West.

As many of you prepare for the upcoming March Break, we’d like to post a little reminder about some of the construction that has been happening here at the Harbour front.

For the remainder of March, the TTC will be limiting access on the University line affecting those traveling between St. George and Union stations. Major re-signalling work over four weekends this month will modernize the TTC signals, relays, wiring and cabling equipment, much of which was originally installed when the University line opened 50 years ago. To accommodate surface travel, a frequent, accessible bus service will operate and shuttle service information is available on the TTC site.

The following weekends will NOT have service between St. George and Union station:

  • Sunday, March 10 (starting Saturday, March 9 at midnight).
  • Sunday, March 17 (starting Saturday, March 16 at midnight).
  • Saturday, March 23 and Sunday, March 24.

For those who are already close to the Harbourfront,  demolition work will continue at the Peter Slip Bridge  after having been delayed due to bad weather. Pedestrian access on the southside of the Peter Slip Bridge is not available due to the confined working space. The northside sidewalk remains open at all times. Crews are expected to remain working in the area until May when the surface of the bridge including the new TTC corridor is complete.

The York Street construction of the new parking lay-by (which will provide a safe area for short-term passenger loading and unloading from coaches and tour buses visiting the waterfront) is nearing completion.  Final paving is expected to be completed this week and regulatory signs will be posted once the lay-by area is finished.

If you’d like to avoid all the driving detours our pedestrian directions from previous blogs still apply or you can plan your route based on the full construction details found at the Waterfront Toronto website.

- Posted by Brittany Holliss, MIA’s Visitor Services Officer

About these ads

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

Follow

Get every new post delivered to your Inbox.

Join 58 other followers

%d bloggers like this: